Mt. Zion Road

Overview


The work that will be completed on Mt. Zion Road (from Midlothian Parkway to Creekbend Drive) will consist of the widening of two (2) lanes. A separate project that will be under construction within a similar time frame is the replacement of the old Mt. Zion Road bridge with two box culverts. This will be a joint City of Midlothian and TxDOT project.

**COMPLETED 2009**

*COMPLETED PROJECT